HV/LV Generator Building

Part of the P21 scheme for the Leeds teaching hospitals NHS trust infrastructure upgrade for the new HV/LV generator building.The foundation works included the breaking down of the steel tube driven piles,excavation and blinding of the base,construction of reinforced concrete pile caps,ring beams and floors. We also installed the site drainage including a 40m3 attenuation tank.